DMR update by John VK4UE
I have approval to install the repeater at the reservoir site on Agnes Street but this will be about 3 months away around September 2021.
In the interim I will be raising the antenna height about another 2 metres in a few days time. Hopefully this and the new duplexer will improve the coverage.
The current temp set up is not pretty sitting on a cupboard.
Motorola MTR2000 with STM32 modem card in the expansion slot.
Cheap 4G modem and duplexer. Diamond X50A antenna. Have fitted 2 additional cooling fans which are not really necessary as the duty cycle is 100 percent and the heat sinks are massive.